Case Studies > Killerby Croft
This property was a large executive home of 600m2, we installed a Ground source heat pump, Buffer cylinder, LPG back up boiler, unvented hot water cylinder and a home booster set to improve the incoming water pressure.
We installed Horizontal ground collectors within the property grounds.
A variety of under floor heating to the ground and 1st floors all fully controllable with optimising touch screen stats.
In this property we provided a large store of hot water to supply the 6 bathrooms.


